Technical services necessary to prepare design media, engineering analyses, and supporting calculations for completion of the design for the tank farm upgrades for waste feed delivery.
The Department of Energy sponsored an initial engineering design study to evaluate the retrofit of Membrane Technology & Research’s membrane-based post-combustion carbon dioxide capture technology at the CEMEX Balcones Cement Plant.
Sargent & Lundy provided independent engineering (IE) due diligence services in support of financing of the Big Plain and Oak Trail Solar Photovoltaic (PV) projects.
Sargent & Lundy provided engineering analysis, licensing support, and business case development for Browns Ferry Units 1, 2, and 3 subsequent license renewal (SLR).
Sargent & Lundy has partnered with Kupono Government Services at the Department of Energy’s (DOE) National Training Center (NTC) to develop and deliver critical training for the department’s employees and contractors.
Performing and managing large complex calculation programs to address legacy concerns, modernize methodologies, and reduce risk.
Sargent & Lundy is providing technical advisory services and performing selected power system studies for Samsung Construction & Trading (C&T) Corp. for new subsea transmission links to offshore islands.
Sargent & Lundy performed structural and architectural design for a first-of-a-kind medical isotope production facility.
Sargent & Lundy supported The Brattle Group in reviewing key elements of the reliability pricing model (RPM) required every four years to comply with the PJM interconnection tariff.
Sargent & Lundy is performing design for replacement of north and south No. 3, No. 4, and No. 5 low-pressure feedwater heaters (FWHs).
Sargent & Lundy developed final design media as well as procurement and fabrication specifications for unique first-of-a-kind high-precision furnaces.
Sargent & Lundy provided engineering design services to support the effluent treatment facility (ETF) at the Department of Energy’s Hanford Site; specifically, the firm developed design media necessary to allow for installation of two steam strippers at the ETF.