HomeFossil PowerNuclear PowerPower DeliveryGlobal Energy ConsultingRenewable & Alternative EnergyNews & PublicationsAbout Us
News & Publications

2004 Papers and Articles

To request a copy of any paper or article, click on the Request links below. A .pdf copy will be emailed to you.

Multi-Pollutant Emissions Control Requirements for Power Plants
Coal-Gen 2004

Examines the current status of proposed regulatory programs and their potential impacts on the power industry. Conflicts and synergisms between the programs are discussed as well as control technologies that might be employed to meet the new requirements.

Request

Permitting a New Coal-Fired Electric Generating Unit Lessons Learned
Coal-Gen 2004

Describes the permitting process for a new coal-fired unit, focusing on experiences from recent permitting work for several proposed coal-fired projects. The NSR process is reviewed, and issues that can delay permitting are identified. Discussion focuses on the BACT analysis and issues associated with competing electricity generating technologies, condensible particulate matter, and startup/shutdown emissions.

Request

Summary of Proposed Mercury Regulations
Air & Waste Management Annual Conference 2004

A timely analysis of pending federal and state legislative alternatives.

Request

Cost-Benefit of Digital Controls Upgrades at Nuclear Power Plants
Pacific Basin Nuclear Conference 2004

Examines the costs, benefits, and risks associated with digital controls upgrade projects. Presents proven successful planning and implementation strategies to maximize the benefits of system level and plant-wide upgrades and reduce the risks.

Request

Development of Pebble Bed Modular Reactor Demonstration Plant
Pacific Basin Nuclear Conference 2004

Reviews the PBMR project on-going in South Africa, including the engineering and development testing and the project plans for engineering, development, construction, and start-up testing for the demonstration plant.

Request

Multi-Module Pebble Bed Modular Reactor Plant Design
Pacific Basin Nuclear Conference 2004

Presents the General Arrangements for an 8-module PBMR plant, based on the single-module demonstration plant intended to be built in South Africa. Includes results of value engineering evaluations of plant systems to identify credible opportunities for system sharing. Discusses the normalized cost reduction for the multi-module plant capital cost when compared to the demonstration plant.

Request

Upgrading System Capacity and Reliability Along the Wasatch Front
T&D World Expo 2004

Reviews the load growth analysis that revealed the need to accelerate upgrades of the transmission and distribution system along Utah's Wasatch Front and discusses how PacifiCorp and the Kenny Alliance delivered a Quantum Leap in capacity and reliability.

Request