Download White Paper: Assessment of Existing Equipment when Converting to Natural Gas Firing
Assessment of Existing Equipment when Converting to Natural Gas Firing
Two case studies review good, economically feasible choices for converting from coal-fired to natural gas-fired units
-
Download White Paper: Perimeter Substation Physical Security Design Options for Compliance with NERC CIP 014-1
Perimeter Substation Physical Security Design Options for Compliance with NERC CIP 014-1
Key considerations for successful implementation
-
Download White Paper: First 500-kV Transmission Line for Tucson Electric Power
First 500-kV Transmission Line for Tucson Electric Power
New line enhances reliability and serves growth
-
Download White Paper: 345-138 kV Substation Upgrade Project
345-138 kV Substation Upgrade Project
Engineering solutions to the many challenges involved in a complex transition from old to new facilities
-
Download White Paper: Heat Rate Improvements and Limitations Based on EPA’s Block Strategies
Heat Rate Improvements and Limitations Based on EPA’s Block Strategies
Case studies on heat rate improvement audits conducted for two NRECA plants
-
Download White Paper: Conversion of Coal-Fired Electric Generating Units to Natural Gas-Fired Units
Conversion of Coal-Fired Electric Generating Units to Natural Gas-Fired Units
Coal to natural gas conversion projects are subject to a number of environmental regulations and permitting requirements
-
Download White Paper: Zero Liquid Discharge Effluent Compliance Strategies for FGD Wastewater
Zero Liquid Discharge Effluent Compliance Strategies for FGD Wastewater
Case study evaluates different combinations of ZLD approaches
-
Download White Paper: Natural Gas Conversion of Existing Coal-Fired Boilers
Natural Gas Conversion of Existing Coal-Fired Boilers
Effective approach to assess project technical feasibility