Client: Horizon Wind Energy, LLC

  • 102 MW for phase I, 198 MW for phase II
  • Phase I 2009, Phase II 2010

Sargent & Lundy performed engineering for Horizon Wind Energy’s Top Crop Wind Farm Phases I & II, located near Pontiac, Illinois.  Sargent & Lundy designed the Katydid Road 345-kV interconnection switchyard, the 345/34.5-kV Top Crop I and Top Crop II project substations, the Top Crop I and Top Crop II 34.5-kV underground collection systems, and 0.2 miles of 345-kV transmission line.

Project Scope:

  • Transmission line engineering and design
  • Substation engineering and design
  • Collection system engineering and design
  • Material and equipment procurement support
  • Construction field services

Full PDF Profile

For more information about our services, please visit our Renewable Energy page.

Matthew Thibodeau




Matthew has worked on solar, wind, biomass, hydroelectric, and geothermal renewable energy projects in more than a dozen countries.