Rebuilding Project for 138 kV Infrastructure Improvements – Longview Heights to Marshall Project

Project addresses potential overload of 69 kV line during outages of interconnecting lines


Print This Page

Longview Heights to Marshall Project
near Longview Texas
Client: American Electric Power


Project Description:

Sargent & Lundy EPC Joint Venture with EC Source Services

  • Public outreach
  • Engineering and design /procurement
  • Construction, testing, and commissioning

The Longview Heights to Marshall Project near Longview, Tex., is being implemented to address potential overload of the existing 69-kV line during outages of interconnecting lines.

The overload issue will be resolved by rebuilding the transmission line from the Longview Heights substation to the Marshall substation.

  • Modifications at two substations (Longview Heights and Marshall)
  • Rebuilding 18 miles of 69kV line to 138kV
  • Distribution underbuild

The execution of this project was performed as a Joint Venture entity called ECSL.  Sargent & Lundy is providing the project management, public outreach support, procurement, and engineering & design for these projects. EC Source is providing the construction services.

The engineering work began in March 2016.  Construction started in October 2016 and complete March 2018.